Home | Company Profile | Products | News | Video Online | Service Center | Solutions | BBS | Contact Us | Chinese
 
 
Weblink
Google

BOPP tape five million square meters of annual production equipment preparation

1.Standards : (except holidays)

20 days per month for each of 10 months, eight hours a day, the width of 1.28 meters substrate production.real width 1.26 m, the production rate of 43m/min per minute (but preferably 24 hours of continuous production,conserve energy and raw materials to achieve efficiency and good).

2.Equipment

A 1.3mx20m a sealing machine (25mx3.5mx4.5m) in the high x width x (size and shape).
B.Slitter 2-1.3m (including Slicer, a paper tube loader, cutting machine, the two small Winder Taiwan).
C.a two-color printer 1.3m (7mx2.5mx2.5m) in the high x width x (size and shape).

3. the energy consumption :

A. coating : about 28KW generators, steam 0.7mpax0.5T
B : Slitter about 12KW
C : About 4KW Press
D. air compressors : 0.7mpax0.7 cubic meters (Displacement)

4 persons : (operations and production personnel, non-management staff)

A coating : 5 (class)
B. cut package : 10
C. printing presses : 2

5. investment in equipment : (excluding boiler, compressor plant)

A coating : X million
B. cut package : X million
C. printing presses : X million      X 50,000 Total : (for reference)
Adhesive tape production process
Rubberized adhesive tape production methods
Copyright for Tianjin Honggang Adhesive Tape Machinery Plant .
Address:NO.2 Eastern Three Taihe Industrial Park,Xiqing District,Tianjin
Tel: 86-22-27799739 Fax: 86-22-27795153 Linkman: Mr.zhai E-Mail: jgjiqi@163.com